Installation of bulkhead is going on at Arlozerov LRT underground station.
Installation of bulkhead is going on at Arlozerov LRT underground station.
One of our teams went to Arlozerov Station for a professional tour
Client / Contractor:
SHIKUN & BINUI SOLEL BONEH
NTA
The first pile of the IMO-DOP in Nigeria was drilled yesterday.
This is a Deck On Piles along unstable ground hence the depth of the piles is about 50 meters.
The structure was modeled using Revit and analyzed with Sofistik.
Client / Contractor: RCC Nigeria.
The work in the field began in the roadway project 2411 "Sde Teiman-Ofakim".
The contractor: A.M.Z Shemesh 1990
The contractor was assisted by the company Shabbat - The Drillers, who will drill the piles.
Photos by: Gal Edri
The contractor began his work on the water conveyors by arranging the floor and the entrance facilities reinforcement and the same time he began to carry our the trial pile after his approval he will begin to carry out the foundation of the bridges.
Kedmor welcomes our new Engineers.
Gilad Tayeb and Rabia Rohana who recently joined our team.
We wish Gilad and Rabia much satisfaction and success.
Kick-off of foundations works at Herling Bridge site
photos: Gadish LTD
Loko Oweto Bridges – Completion of Construction
The construction of the Loko Oweto bridges across the Benue river in Nigeria was recently completed and will be open to traffic once the approach roads are finished.
The Bridges, 1,835 meter long each, were designed by Kedmor for RCC Nigeria who constructed the Bridges.
We wish to thank all of our partners and friends in RCC and SBI International and the soil consultant Israel Klar for a job well done.
The Project in local news: https://www.youtube.com/watch?v=DV4DA0OAk4A&feature=youtu.be
(Images by: arc-deco.com)
The Israeli railway electrification project is speeding up and it has reached Savidor station in the center of Tel Aviv connecting it to Navon station in Jerusalem.
Kedmor is the Structural engineer of the project working with the Spanish contractor, SEMI.
Picture: Electric locomotive @ Savidor station
(Credit: Santiago Lopez, Semi)
A railroad over-crossing bridge adjacent to a communication facility (which is the origin of the name) is located east of the city of Acre.
The bridge provides a way of access to an industrial park developed nearby.
Photos and Video:
Olenik Transportion, Earth Works& Road Construction LTD.
Design of below ground 32m diameter water silo and a variety of retaining walls along a 2.2km stretch of road.
The silo was formed of reinforced concrete and founded on piles, using top-down construction methodologies.
Contractor: K.S.M.G. LTD.
Photo: Eng. A. Kummer
As part of the continued construction of Road 423 from the bridge connecting Highway 4313 to the Begin road our office designed several structures.
Among others, this video presents the ongoing construction of the first stage including retaining and acoustic walls, an underground concrete water reservoir and more.
Enjoy!
Contractor: K.S.M.G. LTD.
Click here for viedo of the road.
Kedmor recently submitted tender documentation for Reading Station, in North Tel-Aviv, on behalf of NTA and in conjunction with Kaan Architects.
Click here to view our project page.
For the end of the year Kedmor had a day out.
We started at Hula Nature Reserve, a beautiful place.
Then we went to eat at Mitbalim restaurant in Rosh Pina.
For dessert we had a muddy Extreme RZR ride at Kalanit.
Kedmor welcomes this year’s placement students, Daniel Nave and Or Natan from Ben-Gurion University of the Negev.
Each will be involved with our projects, gaining valuable practical experience in the design office.
They will also receive guidance for their final university projects from Shimon Senior Engineer and Gal Team Leader.
Please get in touch if you’d like to be part of next year’s student intake.
Mor Machlev reported on the refurbishment of this bridge, damaged by impact loads from lorries, in Construction and Infrastructure Engineering, the magazine of the Israeli Association of Construction and Infrastructure Engineers, Issue 83, August 2019.
Read the full article in Hebrew here.
Micha Petri reported on the design and construction of this 350m long bridge, which connects Israel to Jordan, in Bridge Design & Engineering Magazine.
Read the full article here.
(C) Bridge Design & Engineering
We recently held an interesting CPD seminar at our offices, on bridge tension-cable grouting, from industry expert Alex Poliakov.
He presented examples of grouting and tension-cable failure from around the world and advised on best-practice methods, to mitigate these issues.
Thank you, Alex!
Check out our new page on Instagram!
We’ve compiled some of our best project-photos and images, into one place.
Feel free to follow, ‘like’ and share.