The first pile of the IMO-DOP in Nigeria was drilled yesterday.
This is a Deck On Piles along unstable ground hence the depth of the piles is about 50 meters.
The structure was modeled using Revit and analyzed with Sofistik.
Client / Contractor: RCC Nigeria.