Viewing entries tagged
Engineers

The first pile of the IMO-DOP in Nigeria

The first pile of the IMO-DOP in Nigeria

The first pile of the IMO-DOP in Nigeria was drilled yesterday.
This is a Deck On Piles along ​​unstable ground hence the depth of the piles is about 50 meters.

The structure was modeled using Revit and analyzed with Sofistik.

Client / Contractor: RCC Nigeria.

Imo Nigeria (1).jpeg

Electrifying the Israeli Railways

Electrifying the Israeli Railways

IMG-20200405-WA0023.jpg
IMG-20200405-WA0024.jpg
IMG-20200405-WA0022.jpg
IMG-20200405-WA0021.jpg

The Israeli railway electrification project is speeding up and it has reached Savidor station in the center of Tel Aviv connecting it to Navon station in Jerusalem.

Kedmor is the Structural engineer of the project working with the Spanish contractor, SEMI.

Picture: Electric locomotive @ Savidor station

(Credit: Santiago Lopez, Semi)

Loko-Oweto Bridges, Nigeria

Loko-Oweto Bridges, Nigeria

We recently visited our Loko-Oweto Bridge project construction site in Nigeria.

The eastern bridge is now complete. This was a huge relief for the site logistics team, as the construction of the western bridge can now be carried out from the eastern one, rather than having to continue working from barges on the river!

Kedmor were commissioned to provide structural engineering design and continuous site supervision services for this pair of bridges.