The first pile of the IMO-DOP in Nigeria

The first pile of the IMO-DOP in Nigeria

The first pile of the IMO-DOP in Nigeria was drilled yesterday.
This is a Deck On Piles along ​​unstable ground hence the depth of the piles is about 50 meters.

The structure was modeled using Revit and analyzed with Sofistik.

Client / Contractor: RCC Nigeria.

Imo Nigeria (1).jpeg

Roadway 2411 "Sde Teiman-Ofakim"

Roadway 2411 "Sde Teiman-Ofakim"

20200810_100815.jpg
20200810_132429.jpg
20200810_102804.jpg

The work in the field began in the roadway project 2411 "Sde Teiman-Ofakim".


The contractor: A.M.Z Shemesh 1990
The contractor was assisted by the company Shabbat - The Drillers, who will drill the piles.

Photos by: Gal Edri

The contractor began his work on the water conveyors by arranging the floor and the entrance facilities reinforcement and the same time he began to carry our the trial pile after his approval he will begin to carry out the foundation of the bridges.