Location: Kiriyat Haim, Haifa, Israel
The bridge has a total length of about 240m, comprises of seven spans and crosses a railway at a sharp angle, creating a 46m long main span. The superstructure is a 1.8m deep, pre-stressed concrete hollow box girder.
Two superstructure construction methods were used. The northern and southern edges of the bridge were of in-situ reinforced concrete construction, whilst the middle part of the bridge was precast segments, constructed using the balanced cantilever method.