Hoshaya Bridge opens

The Hoshaya Bridge over Route 77, designed by Kedmor, was opened to traffic.

Photo credit: K.SMG Contractors.

Excavation begins at Arlozorov Station

Excavation works are now underway at Arlozorov underground station, part of the new Tel Aviv Red-Line, light-rail project.

Recent footage captured the temporary works, bracing the station walls during construction.

Kedmor has provided structural engineering design services on this project for RHDHV, who won the design bid for all the Redline underground stations.

Happy New Year 2018

1.jpg

Season's Greetings & Happy New Year to one and all from Kedmor!

Em-HaMoshavot Bridge Control-Centre Tour

As part of preparations for the transition of a tunnel boring machine beneath the foundations of the Em Hamoshavot Bridge, a tour of the Danya Cebus site was undertaken at the Petach Tikva despot to examine the readiness of the project monitoring team.

The tour included:

  • A visit to the control centre located near the tunnel entrance, from which engineers are able to monitor the TBM, tunnel and bridge. They are able to control the TBM navigation system and monitor the bridge foundations located between two tunnels. This monitoring is done 24/7 by a combined team of engineers from Spain and Israel.

  • A visit around the TBM machine located in the western tunnel, accompanied by a project manager, who is responsible for the monitoring. At the time of the visit, the TBM had not yet started drilling, however the last concrete ring had been fabricated.

Office Outing 2017

This year’s office outing included an outdoor breakfast in the scenic Golan, a visit to Kedmor’s Jordan Gateway Bridge, with talks by Shimon and Shahar on its’ design and construction, a BBQ lunch in the Ficus grove, with a great view and in a fantastic atmosphere and a visit to a bio-plant at Kibbutz Sde Eliyahu, where we heard about organic farming and advances in biological pest control.