Our team is proud to be involved in the design of the Aleto Bridges Project in Nigeria.
This project involves the construction of two modern, post-tensioned concrete bridges spanning the Aleto River. Each bridge will feature a sleek, single hollow box-girder design for enhanced aesthetics and functionality.
To ensure efficient construction, the bridges will be built using cast-in-situ segmental concrete. This method, combined with the balanced cantilever method and a form traveler, allows for rapid segment assembly and minimizes construction time.
These new bridges will replace two existing structures, providing a significant upgrade to the transportation network. Each bridge will boast a total length of 160 meters with three spans.
A global model of the bridge was created using SOFiSTiK finite element analysis software to optimize the design for the stages of construction.
Client & Contractor: Reynolds Construction Company
Kedmor Team: Micah Petri, Meital Toledano, Amir Berman, Yerucham Shem Tov, Natali Yehuda, Inbar Talker, May Myat Noe Shwe Moe, Zaw Lwin Tun