Bridge #4 is a cast in-situ post tensioned bridge 25 meter long.
The bridge carries road 2411 over a desert trail.
The bridge’s superstructure was cast in one pour.
Photos by: Etgar- Engineering & Consultancy LTD
Bridge #4 is a cast in-situ post tensioned bridge 25 meter long.
The bridge carries road 2411 over a desert trail.
The bridge’s superstructure was cast in one pour.
Photos by: Etgar- Engineering & Consultancy LTD