The new 2411 route named Ofakim-Sde Teyman road connects the new entrance of Ofakim to the existing road No. 25 by Sde Teyman.
In the picture, mid pier 2 of BR3 over Patish river. This bridge is 80m long, 24.6m wide and has three spans of 24-32m.
The superstructure is designed with eight pre-stressed reinforced concrete beams while the top deck is cast on site.
The contractor: A.M.Z Shemesh 1990
Photos by: Gal Edri