Location: Zeitim Interchange, Jerusalem
This pair of post-tensioned, 125m & 75m long, in-situ curved bridges, are part of the Northern American Road project, for Moriah.
Our 3D BIM model enabled us to easily visualise the interaction between the bridges and the complex site topography, limiting the impact of the ground works on the existing infrastructure and influencing the construction sequence.
The parametric shapes of the bridges required careful analysis using finite element software, to limit the impact of seismic forces on the structure, providing an optimised, efficient design.